Grand Banks embraces a modern approach towards boat building in combination with traditional tricks of the trade, which their experts have finessed over the years. Grand Banks designer, John McKay, explains the build ideology:
“We are combining the benefits of traditional boat building with world leading technology to reduce production time and improve the quality of our products.”
The GB85 puts forward exactly that, with the factory using a combination of hand-built and robot-built methods which have sped up the initial development of the moulding process. The topsides were finished in May and the official GB85 launch is assumed to be in late 2019, we can’t wait!
Just to whet the appetite, here is a reminder of those design features from the GB60 that could find there way onto the GB85.